Akaki Nikabadze Electrical Engineer Akaki Nikabadze joined Bemoni team as an electrical engineer with his 26 years of experience in the field. For many years he was involved in construction of high voltage PTLs. Mr. Nikabadze played a key role in numerous projects, including: Enguri HPP turbine rehabilitation works; Khrami HPP rehabilitation, Khrami HPP-1 and Khrami HPP-2 maintenance and reconstruction works; 110kV Geostyle substation construction in the city of Rustavi; 110kV Kakhri substation construction; 4th phase of Enguri HPP rehabilitation (€35MM); 500kV Didi Zestaponi substation rehabilitation; Besides, he served as the Head the Electrical Workshop at Georgian Manganese.